Project: GAC New Energy Industrial Park 2MW/1MWh Charging Pile Energy Storage Project
Application scenario: virtual power plant
Date: September 2019
Location: Guangzhou, Guangdong
Installed capacity: 2MW/1MWh
Introduction: The project is equipped with a 30-foot 1MW/0.5MWh lithium iron phosphate energy storage system in the two outdoor parking lots in the north and south of the GAC New Energy Industrial Park. The total capacity of the energy storage system is 2MW/1MWh, and the system is connected to the grid. The main function is to participate in frequency modulation and peak-shaving and valley-filling in the park. The subsequent project needs to accept grid dispatch and participate in auxiliary services.